For many projects the earthwork phase of the project forms a substantial part of the projects cost and duration so it’s important to get it right and make it as efficient as possible.

Vegetation Strip is the 1st task on most developments. This is scraped by excavator or dozer, broken up and placed on site to allow the plant matter to break down.

Topsoil Strip is then carried out with care not to mix it with any underlying layers so that it can be re-used. Overhandling topsoils will damage its structure and so with adequate planning and phasing of the project we can ensure that the topsoil is placed in a suitable position and sealed from the ingress of water.

Bulk Excavation and Earthworks can take place once the vegetation and topsoil is removed. Using suitable excavators and dozers the soils can be heaped and stockpiled before being loaded into dumpers and / or tractor trailers to go off site or be placed elsewhere on site.

1M CIVIL ENGINEERING are able to move vast quantities of soil effectively and efficiently to suit all your projects needs.